Got a chance to walk through the construction today. The indoor plaza and suites are going to be amazing....especially the founders suites and Pres and Chancellors suites. All suites have retractable glass, so wen weather is nice, the glass can be rolled out and it becomes open air. I can't wait to see the finished product.
As of now, only electricians are working through the night. They were prepping the drainage under the field. Grass goes down Aug 5-6. They have to be completely done and out by Sept 9.
Also saw Kyler and Daylon. For being that heavy, Daylon does NOT look overweight or anything. Kid is SOLID. Kyler looks bigger than he did in gosh school. Still pretty slight, but has definitely put on some size.
I know rule 1 but they wouldn't allow me to take any pics....sorry!!!
Was a good day though!!!
AGLBU
As of now, only electricians are working through the night. They were prepping the drainage under the field. Grass goes down Aug 5-6. They have to be completely done and out by Sept 9.
Also saw Kyler and Daylon. For being that heavy, Daylon does NOT look overweight or anything. Kid is SOLID. Kyler looks bigger than he did in gosh school. Still pretty slight, but has definitely put on some size.
I know rule 1 but they wouldn't allow me to take any pics....sorry!!!
Was a good day though!!!
AGLBU